Environmental Resources Group (P) Ltd. View of Kali Gandaki 'A' Dam in Nepal
Home About Us Environment Hydropower News Vacancy Contact Us
Web erg.com.np
Powered by Google.com
Consultancy Services
» Scope of Services
» Thrust Areas
Environmental Requirement
» Proposal Requiring IEE
» Proposal Requiring EIA
Professional's Profiles
Hubs of Hydropower
» National Scenario
» Regional Scenario
» Global Scenario
Important Links
Environmental Documents
RealNepal.com.np - It's a Real Experience.
Gandak Hydropower Station
Gandak Hydropower Station is a canal drop scheme with an installed capacity of 15 MW. The powerhouse was commissioned in the year1979.The average (designed) annual generation of this powerhouse is 106.38 GWh. Gandak Hydropower Station has generated 21.596 GWh of energy in fiscal year 061.62, an increase of 161.9% compared to the last years generation. The generation from this power station has contributed 0.89% of the total energy in the INPS.

Salient Features
Designed Head : 6.09 m
Installed capacity : 15 MW
Length of Canal : 18 km
Turbine Generator Set : 3 Nos
Type of Turbine : Kaplan turbine
Turbine Output : 7500 H.P. (5.6 MW)
Type of generator : Totally enclosed synchronous Generator
Rated Voltage of Generator : 6.6 KV
Rated current of Generator : 516 Amps
Rated power Factor : 0.85 (Lag)
Rated Output : 5015 KW
Rated Speed of Unit : 107 rpm
Project Inception Date : 1964
Project Placed in Service : April, 1979
Project Financed by : Govt. of Nepal & Govt. of India
«« Go Back
Top
All News »»
Download PDF of Hydro Nepal
Download PDF of Hydro Nepal
E-mail:
Name:
Copyright © 2007 Environmental Resources Group (P) Ltd.
All Rights Reserved.
Website developed & maintained by Web Fusion Nepal
[Best Viewed at 800×600 Resolution and IE6]