Environmental Resources Group (P) Ltd. View of Kali Gandaki 'A' Dam in Nepal
Home About Us Environment Hydropower News Vacancy Contact Us
Web erg.com.np
Powered by Google.com
Consultancy Services
» Scope of Services
» Thrust Areas
Environmental Requirement
» Proposal Requiring IEE
» Proposal Requiring EIA
Professional's Profiles
Hubs of Hydropower
» National Scenario
» Regional Scenario
» Global Scenario
Important Links
Environmental Documents
RealNepal.com.np - It's a Real Experience.
Kulekhani - I Hydropower Station
Kulekhani -1 is the only one reservoir type Hydroelectric Power Station in Nepal. Its installed capacity is 60 MW having two units each of 30 MW. This powerhouse was designed as peaking power station but it has been supporting as emergency stand by station also. The annual expected energy generation capacity as primary energy is 165 GWH and 46 GWH as secondary energy. This power station has generated 174.092 GWh of energy in fiscal year 061/62, an increase of 10.67% compared to the last years generation. With this generation the reservoir level has gone down to 1488 from 1530.5 mts. Generation from Kulekhani-1 contributed 7.19% in the INPS.

This project was constructed under the financial assistance of World Bank, The Kuwait Fund, OPEC Fund, the UNDP and the Overseas Economic Cooperation Fund (OECF) of Japan and Government of Nepal. The total project cost of the project was US$ 117.843 million and accordingly the project was transferred to NEA with a capital cost approximately NRs. 155 crores. The telemeter system installed for rainfall , water level measurement and indication cost around NRs. 13.74 crores. The cost of road, check dams and inclined tunnel are about 23 crores.

The main purpose for the construction of this power station was to take the peak load only but the unavailability of the sufficient power with respect to demand , the power station was forced to operate as and when required.

Salient Features
Type : Reservoir
Rated net head : 550 meter
Design discharge : 12.1 m3/s
Headrace tunnel : 6233 m, 2.3 m diameter
Penstock pipe : 1324 m long, 2.1 – 1.5m diameter steel pipe
Installed capacity : 60 MW
Turbine type and numbers : Pelton, 2 sets
Rated speed : 600 rpm
Type of generator : Vertical shaft, Synchronous
Capacity : 35 MVA
Rated voltage : 11 KV
Power transformer : 11/66KV, 3 phase, 35 MVA, 2 Nos
Average annual generation : 211 GWh (Primary energy 165 GWH and secondary energy 46 GWH)
Catchments area : 126 sq. km.
Civil construction start : 1977 A.D.
Commissioning date : 14th May, 1982
Construction cost : 117.84 million USD
Financed by : World Bank, Kuwait Fund, UNDP, OECF and OPEC Fund
«« Go Back
Top
All News »»
Download PDF of Hydro Nepal
Download PDF of Hydro Nepal
E-mail:
Name:
Copyright © 2007 Environmental Resources Group (P) Ltd.
All Rights Reserved.
Website developed & maintained by Web Fusion Nepal
[Best Viewed at 800×600 Resolution and IE6]