Environmental Resources Group (P) Ltd. View of Kali Gandaki 'A' Dam in Nepal
Home About Us Environment Hydropower News Vacancy Contact Us
Web erg.com.np
Powered by Google.com
Consultancy Services
» Scope of Services
» Thrust Areas
Environmental Requirement
» Proposal Requiring IEE
» Proposal Requiring EIA
Professional's Profiles
Hubs of Hydropower
» National Scenario
» Regional Scenario
» Global Scenario
Important Links
Environmental Documents
RealNepal.com.np - It's a Real Experience.
Marsyangdi Hydroelectric Power Station
Marsyangdi Hydropower station is a peaking- run- of- the- river type with an installed capacity of 69 MW. The powerhouse was commissioned in the year 1989. Marsyangdi Hydropower Station generated 336.9 GWh of energy in this fiscal year, an increase of 40.65% compared to the last years' generation. The generation from this power station has contributed 13.92% of the total energy in the INPS.

Salient Features
Type : Peak- run- of- the- river
Rated net head : 90.5 meter
Rated Turbine Discharge : 30.5 m3/s
Head race tunnel : 7199m, 6.4m dia., concrete lined
Pressure Shaft : 75m long, 5m dia., steel lined
Surge Tank : 20.5m dia., 56m high concrete throttle shaft
Installed Capacity : 69 MW
Turbine Generator Set : 3 sets
Type of Turbine : Francis
Rated Output : 26 MW x 3
Rated Speed : 300 rpm
Type of Generator : Vertical shaft synchronous
Capacity : 30 MVA
Voltage Ratio : 11/132 KV
Power Transformer : 11/132 KV single phase, 3x 10 kva, 9 Nos.
Designed Average Annual Generation : 462.5 GWh
Catchment Area : 3850 sq. km
Average Annual Discharge : 210 m3/s
Civil Construction Started : February, 1886
Commercial Operation Started : 5 November, 1989
Construction Cost : 221.57 million USD
Financed By : GON, IDA, KFW, SFD and ADB
«« Go Back
Top
All News »»
Download PDF of Hydro Nepal
Download PDF of Hydro Nepal
E-mail:
Name:
Copyright © 2007 Environmental Resources Group (P) Ltd.
All Rights Reserved.
Website developed & maintained by Web Fusion Nepal
[Best Viewed at 800×600 Resolution and IE6]