Marsyangdi Hydroelectric Power StationMarsyangdi Hydropower station is a peaking- run- of- the- river type with an installed capacity of 69 MW. The powerhouse was commissioned in the year 1989. Marsyangdi Hydropower Station generated 336.9 GWh of energy in this fiscal year, an increase of 40.65% compared to the last years' generation. The generation from this power station has contributed 13.92% of the total energy in the INPS.
Salient Features
Type : Peak- run- of- the- river
Rated net head : 90.5 meter
Rated Turbine Discharge : 30.5 m3/s
Head race tunnel : 7199m, 6.4m dia., concrete lined
Pressure Shaft : 75m long, 5m dia., steel lined
Surge Tank : 20.5m dia., 56m high concrete throttle shaft
Installed Capacity : 69 MW
Turbine Generator Set : 3 sets
Type of Turbine : Francis
Rated Output : 26 MW x 3
Rated Speed : 300 rpm
Type of Generator : Vertical shaft synchronous
Capacity : 30 MVA
Voltage Ratio : 11/132 KV
Power Transformer : 11/132 KV single phase, 3x 10 kva, 9 Nos.
Designed Average Annual Generation : 462.5 GWh
Catchment Area : 3850 sq. km
Average Annual Discharge : 210 m3/s
Civil Construction Started : February, 1886
Commercial Operation Started : 5 November, 1989
Construction Cost : 221.57 million USD
Financed By : GON, IDA, KFW, SFD and ADB «« |