Seti Hydropower StationSeti Hydropower Station is a run of river type with an installed capacity of 1.5 MW. The powerhouse was commissioned in the year 1985. The average (designed) annual generation of this powerhouse is 9.8 GWh. Seti Hydropower Station has generated 9.3 GWh of energy in this fiscal year, an increase of 10.58% compared to the last years ' generation. The generation from this power station has contributed 0.38% of the total energy in the INPS.
Salient Features
Type : Run of the river
Design Head : 22.5 m
Design Discharge of Main Canal : 11 m 3/s
Installed Capacity : 1.5 MW
No. of Generators : 3 Nos.
Length of Main Canal : 7.7 km.
Type of Turbine : Francis, Mixed Flow, Synchronous Generator
Rated Capacity : 543 KW
Rated Speed : 500 rpm
Type of Generator : TSW 143/32-12 Synchronous Generator
Rated Voltage : 6.3 KV
Rated current : 57.3 AMP
Length of Penstock pipe : 90 meter
Diameter of Penstock : 2.4 m
Total Length of Tunnel : 1555 m
Project completion dated : July, 1985
Powerhouse commissioning : Nov., 1985
Project Financed by : Peoples' Republic of China and Nepal Government «« |